2Nature

Louisville · landscape & hardscape

Estimates the yard can build from.

2Nature Design Studio’s planting, hardscape, and irrigation bid — markups, plant warranty, crew overhead, contingency, and Kentucky’s 6% tax on landscaping only — as a live estimate and a client-ready proposal.

Sample: Harper Residence, Highlands — planting, stamped patio, Kentucky limestone, stacked wall, tall fescue, irrigation takeoff, dumpster, porta-potty, permits, and a 10% project management line at cost.

Exhibit CD-3
Harper Residence
Residential · 25%
$76,400
QtyItemSell
3Autumn Blaze Maple15 gal$1,360
8Limelight Hydrangea5 gal$800
420Stamped patio, ashlarsf$8,980
180KY limestone flaggingsf$3,950
96Limestone stacked wallsf face$6,680
10%Project managementat cost$3,780

Illustrative lockup. Open the sample for live totals with overhead allocation and 6% Kentucky tax.

The studio math

Gross-margin markup, 6% plant warranty, 4% contingency. A 10% project management fee is billed as its own line at cost. Kentucky 6% tax applies only to landscaping — hardscape is billed pretax. Crew labor at $65/hr.

Zone 5–7 palette

Monrovia plants hardy in Louisville. Size, color, and form each write a cost code. Pricing is verified by the PM.

Hardscape takeoff

Asphalt, concrete, stamped, pool decking, retaining walls, steps, bluestone, gravels — finish and thickness coded.

Proposal & takeoff

Exhibit CD-3 summary, irrigation takeoff (heads, pipe, valves, backflow), mobilization (dumpsters, porta-potties, Metro and MSD permits), warranty language, and a material request the yard can pick.